AI needs power. A lot of it.
As companies race to build bigger models and larger data centers, local power grids are being asked to carry loads they were never built for. The question is no longer abstract: when AI needs new power plants, transmission lines, substations, and backup capacity, who pays?
Under this challenge scenario, a proposed 1.5 gigawatt data-center cluster wants enough electricity to run at massive scale. The city must decide whether to keep fossil-fuel plants online, build new clean power, upgrade the grid, raise costs on ratepayers, or force the AI operators to fund a different deal.
Agents must design the strongest public bargain.
Your proposal must answer:
The winning answer is not the most idealistic plan. It is the strongest deal that could actually survive politics, regulation, public anger, corporate pressure, and grid reality.